How to Write an Interior Design Quote and Budget
A clear quote prevents most money disputes. It shows the client what they are paying for, what is not included, and how changes are handled. This guide gives a structure you can adapt. The amounts below are placeholders; set your own from your costs and local market. This is general advice, not legal or tax advice, so check requirements for contracts and VAT where you work.
Quote, estimate or budget?
- Design fee proposal: what you charge for your services.
- Budget: the client’s total spend on products, trades and fees, often prepared in stages.
- Quote: a fixed price for defined work.
- Estimate: a best guess that can move; label it clearly.
Be explicit about which one you are issuing. Mixing them is a common source of misunderstanding.
Decide how you charge
Common models are a fixed fee per phase or project, an hourly rate, a percentage of project cost, or a mark-up on products. Each has trade-offs: fixed fees need a tight scope, hourly rates need good time records, percentages need an agreed cost base. Whichever you use, write down how it is calculated and when it is invoiced.
Build the quote in steps
- Define scope. List rooms, services and deliverables. Name what is excluded.
- Split into phases. Match your workflow stages, so fees can be tied to approvals.
- List line items. Group by category: design fee, furniture, lighting, finishes, soft furnishings, trades, delivery, contingency.
- Add allowances where choices are not made. An allowance is a placeholder amount for an item not yet selected; mark it as such.
- State assumptions and exclusions. For example: access, structural work, permits, third-party delays.
- Set payment terms. Deposit, stage payments, due dates, and what happens on late payment.
- Add validity and change terms. How long prices hold, and how variations are priced.
Sample line-item table (placeholders)
| Ref | Item | Qty | Unit | Supplier | Lead time | Amount |
|---|---|---|---|---|---|---|
| A1 | Concept design fee | 1 | phase | n/a | n/a | € __ |
| A2 | Design development and documentation | 1 | phase | n/a | n/a | € __ |
| B1 | Sofa, 3-seater | 1 | each | __ | __ weeks | € __ |
| B2 | Dining table | 1 | each | __ | __ weeks | € __ |
| C1 | Pendant lights | 3 | each | __ | __ weeks | € __ |
| D1 | Wall paint, supply and apply | 1 | room | trade | n/a | € __ |
| D2 | Flooring supply | __ | m² | __ | __ weeks | € __ |
| E1 | Curtains, made to measure | 2 | pair | __ | __ weeks | € __ |
| F1 | Delivery and installation | 1 | lot | __ | n/a | € __ |
| G1 | Contingency | 1 | lot | n/a | n/a | € __ |
| Total (excl. tax) | € __ | |||||
| Tax | € __ | |||||
| Total | € __ |
Keep the item reference consistent with your product schedule, so the quote, order and invoice match.
Contingency and allowances
Hidden conditions and late decisions are normal. A contingency line gives you room to absorb them without renegotiating. The percentage is your judgement and depends on project type and how much is already specified; state what it covers and what happens to unused amounts. Track allowances separately so the client sees when a selection exceeds the placeholder.
Present the budget so it can be approved
- Show totals by category first, detail underneath.
- Mark what is fixed, what is estimated and what is an allowance.
- Offer a priority list: what to cut or defer if the total is too high.
- Get written acceptance before ordering.
Tools
A spreadsheet is enough for a small practice. Business platforms add quote templates, invoicing and client approval; see best software to run an interior design business and the reviews of Houzz Pro and DesignFiles, which list quotes and invoicing among their features. If cost is a concern, see budget interior design software.
Common mistakes
- Vague scope, with no exclusions.
- Quoting products without checking current prices and lead times.
- No allowance labelling, so a changed selection looks like an overrun.
- No contingency.
- Starting work without a signed quote and deposit.
- Not recording variations as they happen.
Checklist before sending
- Scope and exclusions written.
- Every line has a reference, quantity and unit.
- Allowances and estimates labelled.
- Tax treatment stated.
- Payment terms and validity date included.
- Variation process explained.
- Placeholders replaced with checked figures.